2024 Annual Record

14,200METRESINSTALLED ACROSS 2024

Commercial fencing for Nairobi's most secured perimeters.

Mombasa Road industrial corridors · Gigiri diplomatic compounds · Athi River estate parcels

Scroll to explore
— 01 · Project Stats

0
Compounds Secured

Across Nairobi's industrial corridors, gated estates, and international compound networks — each project delivered with our own welding rigs on-site.

0

Compounds Secured

Across Nairobi metro

0m

Linear Metres Installed

In 2024 alone

0h

Avg. Project Turnaround

Survey to full install

0%

On-Time Completion

Across all 2024 projects

Client Type Breakdown · 2024

142Gated Residential
37%
118Industrial / Warehouse
30%
79NGO / Diplomatic
20%
48Estate Development
13%
— 02 · Materials & Specifications

4 Fencing
Systems. One Crew.

Every installation uses materials sourced to BS 1722 and KS standards. Our crew carries welding rigs, post drivers, and tensioning equipment on every site visit.

MAT-01High Security

Razor Coil

BTO-22 / CBT-65 Concertina Wire

Gauge / Wire

2.5mm galvanized core

Height Range

450mm – 980mm coil diameter

Typical Applications

Diplomatic CompoundsPerimeter ToppingIndustrial Boundaries
MAT-02Most Specified

Palisade Fencing

D-section / W-section steel pale

Gauge / Wire

3mm – 5mm steel pale

Height Range

1.2m – 3.0m installed height

Typical Applications

Gated CommunitiesCommercial EstatesSchool Boundaries
MAT-03Active Deterrent

Electric Fencing

Nemtek / Stafix energiser systems

Gauge / Wire

2.0mm tensioned wire

Height Range

10–30 strand configurations

Typical Applications

NGO CompoundsWarehousesHigh-Value Storage
MAT-04

Chain Link

Galvanized / PVC-coated mesh

Gauge / Wire

3mm wire, 50×50mm aperture

Height Range

1.2m – 2.4m standard panels

Typical Applications

Rental BlocksParking PerimetersUtility Enclosures
— 03 · Methodology

72-Hour
Average Turnaround

From site survey confirmation to completed installation. The figure covers all project types delivered in 2024 — including 50-acre estate perimeters in Athi River.

01

4h

Response time

Site Survey Request

Submit your compound details. Our survey team confirms within 4 business hours and schedules an on-site assessment within 24 hours.

02

24h

Survey to quote

Assessment & Specification

On-site team measures perimeter, assesses ground conditions, and specifies materials. Written quotation with line-item breakdown delivered same day.

03

48h

Mobilisation

Crew Mobilisation

Post-acceptance, our crew mobilises with welding rigs, post-driving equipment, and all materials. No sub-contracting — your install team is our team.

04

72h

Avg. completion

Installation & Handover

Installation completed to specification. Handover includes photographic record, compliance certificate, and 12-month structural warranty.

— 04 · Compliance & Certifications

Audit-Ready
Documentation

Every Perimeter project is documented to pass security audits for NGO compound certification, diplomatic facility inspections, and estate developer compliance sign-offs.

NCA-REG

NCA Registered Contractor

National Construction Authority

KS-1722

KS 1722 Compliant

Kenya Bureau of Standards

BS-1722

BS 1722 Specification

British Standards Institute

OSHA-KE

OSHA Kenya Compliant

Directorate of Occupational Safety

What every project includes

  • Photographic record of all installations
  • As-built drawings available on request
  • Material certificates and test reports
  • 12-month structural warranty documentation
  • Compliance certificate per project
  • Insurance cover: KES 50M public liability

Procurement lead?

We issue a formal Letter of Compliance for NGO and diplomatic compound procurement processes. Our documentation package is accepted by UN agency security officers across Nairobi.

Insurance Coverage

KES 50M

Public liability · All projects

— 05 · Engage Perimeter

Request a
Site Survey

Submit your compound requirements. Our team responds within 4 hours during business days and will schedule an on-site assessment within 24 hours of confirmation.

Response within 4 business hours

Site assessment within 24 hours